Project: North Star Hotel, Dublin 1
System: Moy Materials: Paralon
Project Description:
Main Roof – Paralon Ard/HS fully torch bonded to TopS 3mm Underlay fully torch bonded to Tapered PIR Insulation bonded to 2mm bitumen vapour barrier fully torch bonded to primed concrete & metal decks.
Metal Pressing; Powder Coated Aluminium Pap Trim 2mm thick complete with welded corners. Galv angle’s and closure pieces to perimeter and all penetrations.
Client: McGettigans
Architect: Tyler Owens Architects
Main Contractor: Monami Construction