UCD Estates Office

Project: ​UCD Richview Building, Roof Replacement/Upgrade
System: IKO Ireland Warm Roof System
Project Description:
Replacement/Upgrade 200 m2: The original roof system was completely removed back down to the concrete deck. This was done in a carefully planned process. The System installed was IKO Ultra Prevent Capsheet fully torch bonded to Systems TO underlay fully bonded to Tapered PIR rigid insulation bonded with PU Adhesive on IKO Sealbase 2mm Vapour control layer fully bonded to primed concrete deck. The building remained live during the upgrading works and NO disruption was caused to the tenants below.

Client: UCD Building Maintenance
Architect: Roof Design & Specification by Titan Roofing
Main Contractor: Titan Roofing