{"id":731,"date":"2023-12-13T21:35:44","date_gmt":"2023-12-13T21:35:44","guid":{"rendered":"https:\/\/www.titanroofing.ie\/?p=731"},"modified":"2024-01-03T21:29:21","modified_gmt":"2024-01-03T21:29:21","slug":"st-marys-ns","status":"publish","type":"post","link":"https:\/\/www.titanroofing.ie\/st-marys-ns\/","title":{"rendered":"St Mary’s NS"},"content":{"rendered":"\n

Project<\/strong>: St. Mary\u2019s N.S. Donnybrook, Dublin 4<\/p>\n\n\n\n

System<\/strong>: Soprema Warm Roof, Kingspan Composite Panel & Condron Tiles<\/p>\n\n\n\n

Project Description:<\/strong><\/p>\n\n\n\n

Main Roof 700m2<\/strong>: The System installed was Soprema Monoflex Capsheet fully torch bonded to Ventiglass 3mm underlay partial bonded to Tapered PIR rigid insulation mechanically fixed on existing Asphalt repaired as a positive vapour control layer. All details encapsulated and sealed into pap trim.<\/p>\n\n\n\n

Roof Cladding 500 m2<\/strong>: Kingspan RW composite roof panel fixed to structural steel supports including all necessary flashing\u2019s and accessories.<\/p>\n\n\n\n

Roof Tiles<\/strong>: Condron roof tiles installed on timber battens and breathable felt to new extension of existing GYM hall roof. Including stripping one side<\/p>\n\n\n\n

Roof Access<\/strong>: We provided a counter balance handrail system to allow the safe future access and maintenance of the Flat roof areas<\/p>\n\n\n\n

Metal Pressing;<\/strong> 2mm thick Powder coated Aluminium Pap Trim, Chimney Capping, Fascia, Soffit and decorative Plank system to entrance Canopy\u2019s<\/p>\n\n\n\n

Client<\/em>: Board of Management, St Mary\u2019s N.S
Architect<\/em>: Walsh Associates
Main<\/em> Contractor<\/em>: C & A Excavations<\/p>\n\n\n\n

<\/div>\n\n\n\n